276°
Posted 20 hours ago

Marflow Shower PL8 - Shower Fixing Plate (PL8) 2 Year Guarantee PL8

£7.325£14.65Clearance
ZTS2023's avatar
Shared by
ZTS2023
Joined in 2023
82
63

About this deal

hmmm, interesting, the thought never crossed my mind. Still strong enough, expecially if you consider that the copper is tightened onto the plate using compression nuts. Works in the same way as the Bristan This approach means that Marflow can proudly boast that its St James range of traditional products is British designed and manufactured. I'm telling you, the shower plates are the best on the market. The Bristan type that Hotdog mentions are identical but don't have the mounting plate to space the pipes apart.

Shower Fixing Kit | Bar Shower Fixing Kit | Marflow

Install 15mm copper hot and cold feed pipes ensuring they will proturde approximately 60mm from the finished wall surface. Newtonsoft.Json.JsonReaderException: Error reading JArray from JsonReader. Path '', line 0, position 0. The steel plate is fixed into the wall cavity during the "first fix" stage with a simple clamping device that holds the pipes in position, perfectly square and at the correct distance apart. Any opinions about the best way to fit a shower into a stud wall. I'm not too worried about the cost, I just want to get it right 1st time. Any links to pictures/products would be greatly appreciated.Plastic construction with brass connectors and chrome-plated shrouds. Enables rigid fixing of any exposed bar valves with 150mm centres to 15mm pipework protruding through the cavity wall surface. Suitable for all plumbing systems.

mixer shower bar | Screwfix Community Forum mixer shower bar | Screwfix Community Forum

Install Ø15mm copper hot and cold feed pipes ensuring they will protrude approximately 60mm from the finished wall surface. I normally chase shower pipes up centrally together then split left and right in a ‘Y’ shape before elbowing out at the right centres. If you followed this method you could simply tee off the hot and cold going left and right at the bath tap height. As Boilers and radiators are installed by third parties, they do have to install in compliance with regulations and manufacturer standards to get the full benefit of the warranty. Yes, I'll be removing the plasterboard so these both look perfect, but I think the Shower PL8 is ideal for me.The Marflow Shower PL8 - a pioneering shower fixing plate designed, manufactured and patented for "first fix" installations. Covered by a worldwide patent, the Shower PL8 is the best solution for achieving perfect pipework and a firmly fixed shower. Using a pipe slice cut the copper pipes to enssure that the shower mixer cover plates meet the finished wall. On each product, under the specification tab, you will find more information on the guarantee or Warranty.

Asda Great Deal

Free UK shipping. 15 day free returns.
Community Updates
*So you can easily identify outgoing links on our site, we've marked them with an "*" symbol. Links on our site are monetised, but this never affects which deals get posted. Find more info in our FAQs and About Us page.
New Comment